Project 3 · Ptolemaida
Passive House Project in Ptolemaida
Passive House construction supervision, heat-recovery ventilation installation and final airtightness verification.

The project
Designed and verified in detail.
A continuous airtight layer was implemented with particular care at membrane joints and window connections. Testing under both depressurisation and pressurisation verified the envelope's performance.
- Continuous airtight membrane layer
- Specialist window-connection details
- Leak detection before final finishes
- Final testing at ±50 Pa
Blower Door Test
Measured airtightness results
The preliminary airtightness test recorded an average n50 value of 0.44 1/h, with 0.43 1/h under depressurisation and 0.45 1/h under pressurisation. The average airflow V50 was 344 m³/h and the air permeability q50 was 0.86 m³/(h·m²).
Average n500,57 1/h
Average V50362 m³/h
Average q501,93 m³/(h·m²)
Project gallery
From design to verification.









Contact
Planning a project that deserves to perform better?
Business details
- Company
- XK Passive House & Engineers Team E.E.
- Address
- 6 Aristotelous & Kioutachias, Florina, Greece
- Hours
- Monday–Friday 09:00–13:00
Until 20:00 by appointment - Principal engineer
- Konstantinos Chatzopoulos
Civil Engineer